and the first steps of the assembly process. Information included in part one includes the building foundation, tools required, assembling and anchoring the base rails and the assembly of the trusses prior to raising them.
PART 2: Truss and truss brace assembly, roof and sidewall vertical frame assembly, and installing the rear and front wall vertical frame and the door jams.
PART 3: Garage door header assembly, walk in door frame assembly, building trim and installing purlins and girts or hat channel.
PART 4: Window frame assembly, garage door trim assembly, sheet metal walls, scoring and cutting sheet metal angles and installing corner trim, eve trim and roof sheet metal.
PART 5: Installing gable trim, butyl caulk, the ridge cap, foam closure strips and installation video conclusion.